247Remote-controlled MV substations
50+Completed projects
10 yearsOf experience
3Countries of operation
MV switchgear cubicles - ENERGOS project
National reference · MV network telecontrol
ENERGOS Project - Abidjan distribution network
Côte d'Ivoire · 2020 – 2022

The largest MV (medium-voltage) network telecontrol project in Côte d'Ivoire. Deployment of a complete SCADA system on the Abidjan 15 kV network: real-time control of 247 substations, IEC 60870-5-104 protocols, RTU/UTR installation on each facility. ENERTEC established itself as the national reference on this strategic market.

SCADAIEC 60870-5-104RTU/UTR15 kVAbidjan
247Substations controlled
2 yearsOf deployment
15 kVNetwork voltage
Yamoussoukro Stadium
MV network telecontrol · Sports infrastructure
Charles KONAN BANI Stadium - Yamoussoukro
Côte d'Ivoire · 2023

Design and commissioning of the telecontrol system for the national stadium's MV substation. Real-time supervision, alarm management, remote control of 15 kV equipment. A flagship project combining technical performance with major sports infrastructure requirements.

Remote control15 kVSupervisionYamoussoukro
1MV substation
2023Commissioning
24/7Supervision
MV pole fitted with a remote-controlled load-break switch by ENERTEC - University of Odienné
15 kV load-break switch · Education
Remote-controlled load-break switch - University of Odienné
Côte d'Ivoire · December 2023

Installation and configuration of a remote-controlled load-break switch on the 15 kV line supplying the university. Our qualified technicians ensured full integration with the regional telecontrol system, enabling automated incident management and rapid power restoration for 5,000 students.

Load-break switch15 kVOdiennéEducation
5,000Students powered
1Load-break switch installed
Dec. 23Commissioning
Fault passage indicators installed by ENERTEC on the MV network - NEDA program
Fault detection · Network automation
NEDA Program - MV fault passage indicators (FPI)
Northern & Western Côte d'Ivoire · CI-ENERGIES

As part of the NEDA program, led by CI-ENERGIES and funded by the World Bank, ENERTEC deployed over 300 fault passage indicators (FPI) on MV feeders across northern and western Côte d'Ivoire, integrated into telecontrol. As a result, locating a fault goes from hours of patrolling to a few seconds from the control centre.

300+ FPIsCI-ENERGIESWorld BankLots 2 & 3North & West
300+FPIs installed
Lots 2 & 3Awarded to ENERTEC
World BankFunding
HV substation program
In development · HV Substations
HV substation construction program 63–225 kV
West Africa · 2024 – 2026

Building on its leadership in MV network telecontrol, ENERTEC is positioning itself in HV substation construction. Feasibility studies, detailed engineering, partnerships with world-class equipment manufacturers. Goal: become the reference player in HV substation construction in West Africa.

63 kV90 kV225 kVIEC 61850West Africa
3Voltage levels
2026Target horizon
W. AfricaOperating area